Al Turus Solar – Nexamp Solar
3/14/23 Submission
- Al Turi Title Report 2021
- Alturus Solar Interconnection Agreement 10.20.2022
- Alturus Solar Civil Permit Set 03.10.2023
- Alturus Solar Env Resource Map
- Alturus Solar Glare Analysis Memo 03.11.2023
- Alturus Solar Glare Analysis Report No Trees 03.10.2023
- Alturus Solar Glare Analysis Report Proposed 17M Trees 03.10.2023
- Alturus Solar Operations And Maintenance Plan Rev1 03.10.2023
- Alturus Solar Response Letter 03.10.2023
- Alturus Solar SU40 Turning Mvmts 03.09.2023
- Alturus Solar Visual Simulations 03.10.2023
Other Documents
- Alturus Solar Planning Board Application 7.18.22
- Alturus Solar Emergency Response Plan 7.18.22
- Alturus Solar Narrative And Waivers 7.18.22
- Alturus Solar Owners Authorization Letter 7.18.22
Cap Repair Plan
Civil & Electrical Design
- Alturus Solar Three Line Diagram
- Alturus Solar Civil Permit Set Rev1 7.19.22
- Alturus Solar Single Line Diagram
Components
- Alturus Solar Components Combined 7.18.22
- GM BL DataSheet
- Q CELLS Data Sheet Q.PEAK DUO XL G11.2 570 590 2020 11 Rev01 EN PRELIM
- SMA2660
Environmental Reports
- Alturus Solar Protected Species Habitat Report
- Alturus Solar USFWS No Further Coordination Letter
- Alturus Solar Wetland Report
- NYSDEC Alturus ETR Correspondence
SEQR
- Alturus Solar SEQR Type 2 Designation Memorandum 7.10.22
- Alturus Solar SEQR Type 2 Designation Memorandum 7.21.22
- NYSDEC Part 617 Summary Changes Type II Actions 06.27.2018
Zoning Variance